Edit base costs, useful life, and criticality for this project. Criticality is a whole number where higher = more critical. Only changed values are saved as overrides — all other values use the global defaults.
Blank inputs show the default value in grey; hover any input to see its default.
Click a row to expand and edit attribute-level rules — life, base cost, and criticality can vary by attribute and by capacity range (e.g. small vs. large boilers).
Loading cost data...
Asset Type
UOM Type
Base Cost
Life (yrs)
Criticality
QC Level
Status
Auto QC Rules
Choose which automated QC checks run for this project. Every rule is on by default;
turn a rule off to exclude it from automated QC flagging for this project.
Changes take effect the next time the QC scan runs.
Barcode formatLengthUp to three fixed lengths, each counting the prefix; a barcode passes when it matches any of them. Leave all three blank to skip the barcode format check for this project.
Loading QC settings...
✅
The QC rule list has not been set up yet. Once rules are defined, each one will appear here with an on/off switch.
Assessor Stats
A fun look at the fieldwork: who's been where, and what they've captured along the way.
Click a card for the full story. Time figures are friendly estimates from save activity, not a time clock.
Loading stats...
🏆
No assessor activity found in this scope
Custom AI Report Instructions
Add project-specific guidance for the AI-generated report narratives. Each box applies to the matching report
section: System Descriptions, Deficiency Narratives (the Finding written for each deficiency), Asset Findings
(the per-asset condition summary in the Viewer's Asset Register export) and Recommendations (both deficiency and
asset recommendations). These instructions take priority over the default writing style for this project
wherever they conflict. Leave a box blank to use the defaults. Core formatting rules (valid output, no cost
figures, full coverage of every system and deficiency) always apply and cannot be overridden. Saved instructions
apply the next time a report is generated or regenerated; existing report text is not rewritten until then.
Loading instructions...
Optional. Attach the project scope as a PDF (max 20 MB). The AI reads it alongside the field data to
align terminology, priorities, and recommendations with the scope. Applies to newly generated and
regenerated reports.